实现行为树执行器、任务协调和技能接口
This commit is contained in:
@@ -0,0 +1,33 @@
|
||||
# BT DR p15; numeric values and phase are new v1.
|
||||
string task_id
|
||||
string subtask_id
|
||||
string target_ref
|
||||
string target_description
|
||||
string source_region_ref
|
||||
string observation_station_id
|
||||
uint32 station_registry_version
|
||||
builtin_interfaces/Time capture_after
|
||||
builtin_interfaces/Duration timeout
|
||||
---
|
||||
uint8 SUCCEEDED=0
|
||||
uint8 FAILED=1
|
||||
uint8 NOT_FOUND=2
|
||||
uint8 AMBIGUOUS=3
|
||||
uint8 status
|
||||
string shelf_id
|
||||
string side_id
|
||||
string column_id
|
||||
string tier_id
|
||||
float32 confidence
|
||||
string observation_id
|
||||
builtin_interfaces/Time observed_at
|
||||
string error_code
|
||||
string message
|
||||
string record_ref
|
||||
---
|
||||
uint8 CAPTURING=0
|
||||
uint8 PROCESSING=1
|
||||
builtin_interfaces/Time stamp
|
||||
uint32 sequence
|
||||
uint8 phase
|
||||
string message
|
||||
Reference in New Issue
Block a user